- FondsZA 0375 - THL Image Collection
- SeriesBF - BF Collection
- File660 - BF Collection File 660
- 10 more...
- ItemBF660_11 - Ballasting railway track.
- ItemBF660_12 - 3kV DC overhead line equipment, traction linesmen adjusting a Siemens section insulator.
- ItemBF660_13 - Pretoria. 3kV DC electrification, Rosslyn – De Wildt number 2 line, tests to measure contact wire uplift. Six SAR Class 6E1's travelled in both directions with trailing pantographs at 50, 70 and 90 km/h on a test section between mast pole 33/9 and 33/10 with a temporary mast halfway between them All three mast poles were instrumented to measure contact wite uplift, technician setting up measuring equipment at mast pole 33/10. A linear potentiometer visible above the right hand of the technician measured contact wire uplift.
- ItemBF660_14 - Siding switch padlocked in the off position. Safety Notice in red requires all persons to be warned and be away from equipment before the power is switched on. After shunting is complete, the siding switch must be padlocked in the off position.
- ItemBF660_15 - Tracklaying machines.
- ItemBF660_16 - Jazz band at work.
- ItemCA_17147 - Railway station.
- ItemCB_011_018_76 - 1976. Making measurements at experimental track section.
- ItemCB_018_010_82 - 1982. SAR Trackmaster inspection trolley No K820762.
- 37 more...